With increasing urbanisation and the impacts of climate change, flooding is becoming one of the most common natural disasters to affect not just Australia but the entire world.

Integrated stormwater management requires an holistic approach by several different stakeholders, from the initial strategy and masterplanning phase through to construction documentation. At PJA we work closely with architects, hydraulic engineers and planners to achieve an optimum stormwater management design and documentation package.

Often an approved integrated water management design is required to satisfy planning requirements prior to construction commencing. PJA have built strong relationships with local authorities to achieve best practice guidelines in a timely manner.

Find out more

For more information please contact: